970-986-0224

mstafford@globalnitrogenservices.com

The use of nitrogen gas circulated into the production conduit to displace liquids and reduce the hydrostatic pressure created by the fluid column. Nitrogen lifting is a common technique used to initiate production on a well following workover or overbalanced completion. A coiled tubing string is generally used to apply the treatment, which involves running to depth while pumping high-pressure nitrogen gas. Once the kill-fluid column is unloaded and the well is capable of natural flow, the coiled tubing string is removed and the well is prepared for production.